On July 4, 2010, the 3-person team led by SCG project operation director, Mr. Surapon visited Sinoma EC. Sinoma EC’s Chairman of Board of Directors, Mr. Zhang Qi, General Manager, Mr. He Xinping, Vice President, Mr. Ge Liwu, Chief Engineer, Mr. Dong Lanqi respectively met with them.

 

">

久久精品欧美一区二区三区麻豆-久久亚洲精品日韩高清-亚洲天堂精品视频-欧美一进一出抽搐大尺度视频-亚洲精品无码不卡久久久久-免费视频a-jizz毛片-高清欧美精品xxxxx在线看-亚洲 另类 春色 国产-www,超碰-国产亚洲欧美精品久久久www-激情五月中文字幕-色哟哟—国产精品-a级一级黄色片-成年黄页网站大全免费无码-成人国产精品蜜柚视频-欧美区一区二区-h漫全彩纯肉无码网站-亚洲男人第一无码av网站-黑人无套内谢中国美女

Position: 首頁 < Home < News < Company News

Technical Communications between Sinoma EC and SCG

PublishDate:2010-07-13 Source:

On July 4, 2010, the 3-person team led by SCG project operation director, Mr. Surapon visited Sinoma EC. Sinoma EC’s Chairman of Board of Directors, Mr. Zhang Qi, General Manager, Mr. He Xinping, Vice President, Mr. Ge Liwu, Chief Engineer, Mr. Dong Lanqi respectively met with them.

In the two-day meeting, technical details were talked, including WHR power plant operation, maintenance, spare parts supply and plant overhauling. Leaders and employees from marketing, project execution, technical and R&D, procurement, after sale divisions attended these discussions.

Sinoma EC built 6 WHR power plant for 3 cement plants of SCG, with total installed capacity of 58MW. The WHR plants for SCG TS plant first phase (9MW), second phase WHR (22MW), TL plant (18MW), LP plant(9 MW) were built by Sinoma EC, and all of them are now in good operation.

?